🌍 🌐 English
Flooring

KingFloor PUMD System

Medium to heavy-duty flow-applied polyurethane topping

SpecWorld has the Spec Pack, CSI specification and drawings for registered specifiers.

Build-up

Applied in this order, from the substrate up. Layers drawn with a dashed outline are optional.

KingFloor PUMD System, layer by layer
KingFloor PUMD System build-up Substrate123
Not to scale. Thicknesses are shown for clarity.
No.ProductFunctionRate or thickness
SubstrateConcrete, clean, dry (below 75% RH), free of laitance; 4 x 3 mm anchor rebate 150 mm from walls
1 KingFloor Primer DPM Optional Two coats when the RH is above 86%, fully cured before KingFloor Primer. Damp-tolerant pre-primer
2 KingFloor Primer More than one coat on porous or textured surfaces. Primer
3 KingFloor PUMD Trowel applied then spike rolled while wet; resin, hardener and filler are one product. Flow-applied PU screed / wearing course 4 - 6 mm; approx. 2.8 m²/kit (19 kg) at 4 mm
Turn the build-up in 3D
Drag to turn. Click to separate the layers.

Build-up options

  • 4 - 6 mm; temperature resistance -15°C to 80°C quoted at 6 mm
  • RH > 86%: 2 coats KingFloor Primer DPM before KingFloor Primer

About this system

A three-pack water-based polyurethane topping over an epoxy primer. Seamless, hygienic and hard-wearing for medium to heavy-duty industrial floors. Available with an anti-slip finish.